Skip to content
Screenshot

Primary Menu
  • About ACE Magazine
  • Home
  • 2024
  • August
  • 21
  • GERMAN AIR FORCE EXTENDS INITIAL FLYING TRAINING CONTRACT WITH GROB AIRCRAFT

GERMAN AIR FORCE EXTENDS INITIAL FLYING TRAINING CONTRACT WITH GROB AIRCRAFT

Kateřina Urbanová 21.8.2024 1 minute read
G_120TP_alps_do_clanku

Grob Aircraft is proud to announce that the German Air Force has extended its Initial Flying Training contract and will continue to rely on the Grob G 120TP as its training aircraft for years to come. Grob Aircraft will provide the necessary infrastructure and aircraft at its facility in Goodyear, Arizona, USA, for the next several years, continuing the initial contract, which was signed in 2021. The German Air Force will use the Grob G 120TP as the entry aircraft for future German fighter pilots in preparation for the ENJJPT training program at Sheppard Air Force Base, Texas.

The G 120TP has been designed to meet the future needs of global air forces with well-balanced performance, side-by-side seating, high reliability, and competitive economics. Certified to the latest airworthiness standards, it features enhanced aerodynamic performance and future-oriented flexible avionics, including both civil and military communication and navigation systems, providing excellent situational awareness and safety features.

By improving the quality of initial through basic level flight training while realizing significant savings in lifecycle costs, combined with unmatched dispatch reliability, the G 120TP sets a new and unmatched standard in military pilot training.

About the Author

Kateřina Urbanová

Administrator

View All Posts

Post navigation

Previous: BABCOCK: SUPPORTING THE NEXT GENERATION OF UKRAINIAN FIGHTER JET PILOTS
Next: A flying mind in a dynamic world: how Aleš Fikar steers the future of aviation with anwavering flexibility

Related Stories

Screenshot 2026-05-18 at 10.41.19
8 minutes read

Embraer’s Record First Quarter Is Not Just a Financial Result. It Is an Industrial Signal.

Kateřina Urbanová 18.5.2026 0
Aeralis.com
6 minutes read

AERALIS Enters Administration as UK Defence Investment Plan Delays Hit Industrial Confidence

Kateřina Urbanová 16.5.2026 0
ChatGPT Image May 14, 2026, 10_42_10 AM
3 minutes read

ISTEC and SiNAB Sign Collaboration Agreement to Advance Integrated ISR, Counter-UAS and Communications Capabilities

Kateřina Urbanová 15.5.2026 0

You may have missed

Untitled design-5
14 minutes read

Starship V3: SpaceX Scrubs First Launch Attempt of Its Next-Generation Megarocket

Kateřina Urbanová 22.5.2026 0
Screenshot 2026-05-21 at 8.11.27
5 minutes read

3 Critical Design Challenges for Modern Aircraft Seating and How to Solve Them

Kateřina Urbanová 21.5.2026 0
Screenshot 2026-05-18 at 10.41.19
8 minutes read

Embraer’s Record First Quarter Is Not Just a Financial Result. It Is an Industrial Signal.

Kateřina Urbanová 18.5.2026 0
Aeralis.com
6 minutes read

AERALIS Enters Administration as UK Defence Investment Plan Delays Hit Industrial Confidence

Kateřina Urbanová 16.5.2026 0
Copyright © All rights reserved. | MoreNews by AF themes.